Proposed Projects for Big Shanty
Splost III Funding
Kitchen Modification: Convert dish washing area to storage, provide new furnishings & equipment, repair doors & frames and refinish area.
Sitework: Asphalt Paving – Additional Parking – LSR – provide additional parking
Sitework: Erosion Control – LSR – Provide erosion control on hill in bus loading area
Thermal & Moisture Protection: Roofing – Reroof buildings 2400, 240A,B,C&F. Metal roofing on sloped areas. Replace Tectum deck with conventional decking.
Mechanical: Sprinkler (Fire Suppression) – Add fire suppression system (sprinklers) to the portion of the building, including ceiling replacement.
Electrical: Clock – Clock system replacement with GPS technology system.
Electrical: Lighting – Retrofit – Replace T-12 lamps and ballasts with T-8 lamps and High Efficiency electronics ballasts. Fixture replacement.
Electrical: Power – Upgrade – LSR – Provide additional power in all areas
Obsolete work station replacement
District Printer/Copier/Duplicator Solution Replacement
District Servers Replacement
Obsolete Computing Device Replacement for Every Teacher
Maintain District Network
Replace and Enhance Existing Phone System district Wide
Centralized Video Distribution System
Audio Visual Equipment for Each Classroom
Interactive Classroom Devices