Below is the DRAFT version of the Splost 3 notebook as it applies to Wheeler High School.

To view the entire SPLOST proposal go to http://www.cobbk12.org/SPLOST/.

We want to gather any input or questions as able, before it is finalized. We encourage you to look at the summaries on the district website and compare what each high school is receiving. Please send comments, questions or suggestions to Gordon Pritz Gordon.Pritz@cobbk12.org

Wheeler High School - Additions & Modifications

1 Addition - Enclosed Corridor LSR Add an enclosed corridor between the Special Ed building and the main building
2 Modification - Art LSR Modify/renovate art classrooms: plumbing fixtures, ceiling and lights, flooring, painting, casework, etc.
3 Modification - Main Building Modify/renovate the Building: replacement of flooring, ceiling and lighting, plumbing fixtures, toilet partitions, hand dryers, paint, etc. .
4 Modification - Kitchen & Cafeteria Modify and renovate the cafeteria and kitchen: add 4300 sf and modify 11300 sf: to increase seating space and increase serving lines, convert dishwash area to serving area and purchase equipment, aircondition the kitchen, upgrade the electrical and plumbing replace ceiling and lighting, and paint, etc.
5 Sitework - Asphalt Paving Repave parking lots.
6 Sitework - Irrigation Install irrigation meter and irrigation service main.
7 Concrete - Construction - Retaining Wall Retaining wall replacement. Repair or replace the retaining wall at the baseball field.
8 Doors - Exterior - Replacement Replace the aluminum exterior doors with hollow metal doors and frames.
9 Finishes - Ceilings Replace the ceiling tile and grid in the main building: 5090, 509A, 5A90.
10 Finishes - Flooring Flooring replacement
11 Mechanical - Fire Sprinkler Head Replacement Replacement of recalled fire sprinkler heads.
12 Mechanical - HVAC Replace HVAC in main building [5090] and install controls.
13 Mechanical - Plumbing - Flush Valves Replacement of shut-off/flush valves.
14 Mechanical - Plumbing - Water Heaters Replace storage tank with a 150 gallon water heater.
15 Electrical - Clock Clock system replacement with GPS technology system.
16 Electrical - Sound - Stadium Replace the stadium PA system, and wiring from the announcer's booth to all speakers and replace the speakers.
17 Obsolete Workstation Replacement
18 District Printer/Copier/Duplicator Solution Replacement
19 District Servers Replacement
20 Obsolete Computing Device Replacement for Every Teacher
21 Maintain District Network
22 Replace and Enhance Existing Phone System District Wide
23 Centralized Video Distribution System
24 Audio Visual Equipment for Each Classroom
25 Interactive Classroom Devices
26 Athletic Facility Upgrades and Artificial Turf

Items that Wheeler requested but were not granted:

Renovation of the entire main building including administrative and counseling offices, addition of a conference room
Repairs to old gym, including retractable basketball goals
Replacement of front facade
Replacement of the church building with upgraded culinary arts, electronics lab, black box theater, horticulture, additional classrooms and potential engineering academy
Renovation of the auditorium, including ceiling mounted LCD projector, new seats, carpet
Upgrading of the media center to standards of new schools
Landscaping
Replacement of Wheeler's 6 trailers

Please send comments to Gordon Pritz Gordon.Pritz@cobbk12.org