1.  

Ed-Splost VI Project Tracker

SHARE
twitter

Ed-SPLOST VI: Special Purpose Local Option Sales Tax for Education

splost-image.1d1533135964.jpg
       

124 schools and facilities · 275 projects66 schools · 138 projects26 schools · 64 projects17 schools · 54 projects15 schools and facilities · 19 projects

Acworth Elementary School
Flooring Replacement
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Addison Elementary School
Renovations
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Window replacement as needed, carpet replacement, paint, restroom renovations, and modify front entrance for security.

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Replace Playscape
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Adult Education Center

Project information for this school is coming soon.

Allatoona High School
Site Improvements
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Ramp: Add waterproof coating to pedestrian ramps. Prevent water infiltration. Paint structural steel and handrails. Canopy: Replace canopies/awnings at Gymnasium and Theater

Tennis Court Resurfacing
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Learning Commons Flooring Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Argyle Elementary School
Flooring Replacement
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Replace Bus Canopy
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Roof Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Window Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Aspire
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Doors, restrooms

Austell Elementary School
Front Office Renovations
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Awtrey Middle School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Doors, replace water distribution piping, restrooms, roof replacement

Auditorium Seating Replacement
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Window Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Baker Elementary School
Roof Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Barber Middle School
Sidewalk Improvements
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Auditorium Seating Replacement
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Window Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Bells Ferry Elementary School
Addition - 30 IU Replace/3 IU Add
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Replace oldest structures with new classroom wings, new admin suite, and new learning commons. Correct ADA and code issues, enhance pedestrian and vehicular access and safety.

Belmont Hills Elementary School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Doors, fire alarm, HVAC Improvements, new water coolers, restrooms

Add Parking
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Replace Playscapes
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Betty Gray Middle School
Renovations
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Door and Window Replacement, Electrical Improvements (sub-panel upgrades and new emergency generator), refinish gym floor, new window blinds, restroom renovations, replace auditorium seating, and roof replacement.

Big Shanty Elementary School
Renovations
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Door and window replacement, HVAC improvements, water piping replacement, restroom renovations, sidewalk improvements, and replace canopies.

Birney Elementary School
Renovations
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Window replacement, paint (interior and exterior), restroom renovations, roof replacement

Asphalt Resurfacing
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Replace Playscapes
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Blackwell Elementary School
Renovations
Status: CompleteNot StartedIn DesignIn ConstructionComplete

HVAC replacement, roof replacement, window replacement

Brown Facility
Door Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

HVAC Improvements
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Brumby Elementary School

Project information for this school is coming soon.

Bryant Elementary School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Flooring, restrooms

Roof Replacement
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Bullard Elementary School
New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Campbell High School
Renovations
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Door and window replacement as needed, new flooring, paint, and restroom renovations

Tennis Court Resurfacing
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Stadium Improvements
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Refurbish grandstands, replace press box

Track Resurfacing
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Campbell Middle School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Windows, paint, masonry (regrout brick), restrooms, concrete paving (sidewalks)

Campus Police (South Cobb Drive)
South Cobb Dr - Emergency Generator
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Career Academy #2 (Northern Cobb)
Northern Cobb Area
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

CITA #2 Cobb Innovation & Technology Academy Pathways: Advanced Computing, Skill Trade (Manufacturing, Mechatronics), Healthcare, Aviation

Chalker Elementary School
Fire Alarm Replacement
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Cheatham Hill Elementary School
HVAC/Elec Renovations
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

HVAC Improvements (entire facility), replace emergency generator

HVAC Improvements
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

HVAC Improvements and new emergency generator

City View Elementary School
Replace Playscapes
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Clarkdale Elementary School
Painting
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Clay Harmony Leland Elementary School

Project information for this school is coming soon.

Cobb Horizon High School

Project information for this school is coming soon.

Cobb Innovation and Technology Academy

Project information for this school is coming soon.

Cobb Online Learning Academy at CHHS

Project information for this school is coming soon.

Cobb Virtual Academy

Project information for this school is coming soon.

Compton Elementary School
Renovations
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Flooring, paint, renovate front office entrance, restrooms, replace canopy (Car rider), Roof replacement, replace window blinds

Replace Playscape
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Cooper Middle School
Auditorium Seating Replacement
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Flooring Replacement (Admin/LC/Aux Gym)
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Daniell Middle School
Renovations
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Roof replacement (annex building only), exterior door replacement, electrical subpanel upgrades, carpet replacement, restroom renovations, paint Aux Gym, and correct site water issue at Aux Gym

Auditorium Seating Replacement
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Davis Elementary School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Windows, flooring, restrooms

Asphalt Resurfacing
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Replace Playscape
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Dickerson Middle School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Doors, windows, HVAC improvements, Restrooms

Dodgen Middle School
Renovations
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

HVAC improvements, roof replacement, door replacement as needed, new fire alarm, replace epoxy flooring, modify entrance for security, concrete paving (sidewalks), correct erosion issues

Dowell Elementary School
Renovations
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Correct foundation issues, window replacement as needed, flooring replacement (carpet and VCT), restroom renovations (including partition replacement)

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Due West Elementary School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Paint, restrooms, replace canopy, new building lettering, roof replacement

Replace Playscapes
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Durham Middle School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Repair fascia panel, new water coolers, restrooms

Fire Alarm Replacement
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

East Cobb Middle School

Project information for this school is coming soon.

East Side Elementary School
ADA Ramp & Curb Cut
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Add Canopy
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Stairwell Flooring Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Eastvalley Elementary School

Project information for this school is coming soon.

Fair Oaks Elementary School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Enclose connecting corridor, doors, HVAC, replace water piping, new water coolers, concrete sidewalks, roof replacement

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Replace Playscape
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Floyd Middle School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Replace exterior concrete steps, doors, electrical panels, HVAC Improvements, restrooms

Ford Elementary School
Site Improvements
Status: CompleteNot StartedIn DesignIn ConstructionComplete

Correct drainage at building; replace domestic water service line

Roof Replacement
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Flooring Replacement
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Frey Elementary School
Restroom Renovations
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Fire Alarm Replacement
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Garrett Middle School
Renovations
Status: CompleteNot StartedIn DesignIn ConstructionComplete

Roof replacement, restroom modernization

Auditorium Seating Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Garrison Mill Elementary School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Concrete curbs and gutters, restrooms, new bus canopy, roof replacement

Green Acres Elementary School
Renovations
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

HVAC, windows, flooring, elevator, front office, water coolers

Parkin Lot Improvements
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Revised circulation patterns, including a new entrance , striping, and markings to improve safety at student drop-off and pick up.

Replace Playscapes
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Griffin Middle School
Renovations
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Modify entrance for security, renovate FACS classroom, door and window replacement as needed, replace emergency generator, flooring replacement, and paint. Refurbish elevator.

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Harrison High School
Renovations
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Roof & HVAC Replacement, Restroom Renovation, FACS I.U. Renovation

Track Resurfacing
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Add Parking
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Hawthorne
Asphalt Resurfacing/Add Parking
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Painting
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Hayes Elementary School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Electrical panel improvements, restrooms

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Hendricks Elementary School
HVAC Improvements
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Hightower Trail Middle School
Renovations
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Flooring, paint, replace windows as needed

Sidewalk Improvements
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Fire Alarm Replacement
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Painting
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Hillgrove High School
Site Improvements
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Add waterproof coating to pedestrian ramps. Prevent water infiltration. Paint structural steel can handrails.

Tennis Court Resurfacing
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Asphalt resurfacing
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Track Resurfacing
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Hollydale Elementary School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Enclose connecting corridor, doors, windows, flooring (carpet), HVAC improvements, restrooms, Roof replacement

Human Resources (580 Glover Street)
HVAC Improvements
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

580 Glover St - HVAC Improvements
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Keheley Elementary School
Renovations
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Roof replacement, door and window replacement as needed, restroom renovations, paint and add canopy

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Replace Playscape
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Kell High School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Clean/restore fascia, replace exterior doors, window replacement, flooring, replace telescoping bleachers, masonry restoration, renovate CTAE (Culinary Arts), concrete paving (ramps), replace canopy/awnings

Tennis Court Resurfacing
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Track Resurfacing
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Kemp Elementary School
Add Parking
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Roof Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Kennesaw Elementary School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Flooring, modify entrance for security, restrooms

Replace Playscape
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Kennesaw Mountain High School
Renovations
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Replace HVAC (entire facility), renovate restrooms, CTAE Construction Lab renovations, Replace telescoping bleachers in gymnasium, new fire alarm, replace doors as needed

Stadium Lighting Improvements
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Auditorium Seating Replacement
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Kennesaw Warehouse
Fire Sprinkler Replacement
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Exterior Painting
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Kincaid Elementary School
Addition - Replace Annex
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Demolition of the existing Annex Building. Replacement of classrooms lost to the annex building demolition as needed, Roof Replacement, Door Replacement (as needed), Replace PE Lighting, Renovate Front Entry - Security, Restroom Renovations, Asphalt Paving – Add Parking, Replace 2 Playscapes/Surfacing.

King Springs Elementary School

Project information for this school is coming soon.

LaBelle Elementary School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Windows, replace sanitary sewer line, restrooms, replace canopy

Fire Alarm Replacement
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Lassiter High School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Replace exterior doors, window replacement, replace lighting in main corridor, replace/remove skylights main corridor, replace acoustical panels band/orchestra/choral, replace art room casework, renovate science storage, HVAC improvements (weight room only), restroom renovations, new window blinds

Track Resurfacing
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Stadium Refurbishment
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Refurbish grandstands, renovate press box, ADA improvements

Asphalt Resurfacing
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Lewis Elementary School
Renovations
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Replace EIFS panels, window replacement, fire alarm, flooring, paint, restroom renovations, roof replacement

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Replace Playscapes
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Lindley Middle School
Roof Replacement
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Flooring Replacement
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Auditorium Seating Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

New Window Blinds
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Lost Mountain Middle School
Plumbing Improvements
Status: CompleteNot StartedIn DesignIn ConstructionComplete

Replace water distribution shut off valves

Auditorium Seating Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Window Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Lovinggood Middle School
Renovations
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Flooring and auditorium seating replacement

New Bottle Filler Water Coolers
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Learning Commons and Aux Gym Flooring
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Mableton Elementary School
Mirror Replacement
Status: CompleteNot StartedIn DesignIn ConstructionComplete
New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Mabry Middle School
Renovations
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Replace doors as needed, restroom renovation (include replacement of partitions)

Maintenance (560 Glover Street)
560 Glover St - Emergency Generator
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

McCall Primary School
New Window Blinds
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Replace Playscape
Status: CompleteNot StartedIn DesignIn ConstructionComplete
McCleskey Middle School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Doors, paint, restrooms, replace PE lockers

Auditorium Seating Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
McClure Middle School
Learning Commons HVAC
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Roof Replacement
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Flooring Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

McEachern High School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Doors, windows (Dobbs), HVAC Improvements (Theater & Fine Arts Bldg), restrooms

Tennis Court Resurfacing
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Stadium Improvements
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Replace the home grandstands/concessions/restroom/team room, refurbish the visitors grandstands,

Bleacher Replacement - Main Gym
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Career Tech Building Painting
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Asphalt Resurfacing
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Milford Elementary School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Windows, paint, roof replacement

Concrete Improvements
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Painting
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Roof Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Window Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Mount Bethel Elementary School
Addition - Replace Annex
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Demolition of the existing Annex Building. Replacement of classrooms lost to the annex building demolition as needed, HVAC Improvements, Door Replacement (as needed), Flooring Replacement, Restroom Modifications, Front Entry Security.

Playscapes
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Mountain View Elementary School

Project information for this school is coming soon.

Murdock Elementary School
Addition - Replace Annex
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Demolition of the existing Annex Building. Replacement of classrooms lost to the annex building demolition as needed, Door Replacement (exterior doors), Flooring Replacement, New Fire Alarm, Paint, Restroom Renovations, Asphalt Paving – Reconfigure Traffic Flow, Replace 1 Playscape/Surfacing, Front Entry Security.

New Elementary School (Southern Cobb)
Southern Cobb Area
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TDB

New Elementary School - Site TBD

Nicholson Elementary School
Renovations
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Foundation repairs, new fire alarm system, flooring, paint, plumbing (water heaters), renovate front office, renovate restrooms, asphalt repaving, sitework grading (erosion issues), new bus canopy

Replace Playscape
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Nickajack Elementary School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Replace exterior doors, paint, HVAC improvements, replace canopies, roof replacement

Replace Playscape
Status: CompleteNot StartedIn DesignIn ConstructionComplete
North Cobb High School
Renovation - Modernization
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Modernization of the 1950, 1960, & 1970 Era Buildings

Stadium Refurbishment
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Refurbish grandstands, replace press box, add restrooms

Norton Park Elementary School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Door Replacement, Flooring, Paint, HVAC Improvements, Restroom Renovations

Osborne High School
Tennis Court Resurfacing
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Stadium Improvements
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Refurbish grandstands

Track Resurfacing
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Bleacher Replacement - Aux Gym
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Cafeteria Window Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Band/Orchestra/Choral Flooring Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Palmer Middle School
Roof Replacement
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Add Front Canopy
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Auditorium Seating Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Pearson Middle School

Project information for this school is coming soon.

Pebblebrook High School
Renovations
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

HVAC, doors, windows, paint, water heaters, restrooms, front entry vestibule

Tennis Court Resurfacing
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Bleacher Replacement - Aux Gym
Status: CompleteNot StartedIn DesignIn ConstructionComplete
New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Pickett's Mill Elementary School
Carpet Replacement
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Painting
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Add Parking
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Pine Mountain Middle School
New Stage Curtain
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Door Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Painting
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Learning Commons Flooring Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Pitner Elementary School
Fire Alarm Replacement
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Flooring Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

New Window Blinds
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Replace Playscape
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Pope High School
Renovations
Status: CompleteNot StartedIn DesignIn ConstructionComplete

New baseball press box, baseball field improvements, locker room renovations, flooring replacement in Media Center and Band Room, removal of corridor lockers, security vestibule, custodial door replacement, exterior door replacement

Stadium Improvements
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Stadium improvements (metal grandstands), renovate press box

Powder Springs Elementary School
Renovations
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Roof replacement, flooring, restrooms, electrical

Powers Ferry Elementary School
Renovations
Status: CompleteNot StartedIn DesignIn ConstructionComplete

Flooring, Doors, Cafeteria Windows, Toilet Room Partitions

Asphalt Resurfacing
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Riverside Elementary School
Restroom Renovations
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Rocky Mount Elementary School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Concrete paving (ramp to playground), doors, windows, paint, restrooms

Rose Garden
HVAC
Status: CompleteNot StartedIn DesignIn ConstructionComplete

HVAC replacement, electrical panel replacement

Renovations
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Replace doors as needed, replace windows as needed

HVAC Improvements
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Asphalt Resurfacing/Add Parking
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Russell Elementary School
Renovations
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Roof replacement, foundation repairs, door replacement, window replacement, flooring, paint

Add Parking
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Replace Playscape
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Sanders Elementary School
Replace Canopies
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Fire Alarm Replacement
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

HVAC Improvements
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Sedalia Park Elementary School
Renovations
Status: CompleteNot StartedIn DesignIn ConstructionComplete

Flooring, Doors, Windows, Toilet Room Partitions, Sidewalk Repair

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Shallowford Falls Elementary School
Renovations
Status: CompleteNot StartedIn DesignIn ConstructionComplete

Door Replacement, HVAC Replacements, Plumbing improvements (replace all copper lines), Restroom Renovations,

Add Parking
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Replace Playscape
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Simpson Middle School
Carpet Replacement
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Painting
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Auditorium Seating Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

PE Locker Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Smitha Middle School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Windows, flooring, paint, masonry restoration, new water coolers, modify entrance for security, roof replacement

Asphalt Resurfacing
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Smyrna Elementary School
Site Improvements
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Asphalt paving, masonry restoration, and partial san sewer line replacement

Sope Creek Elementary School
Addition - Replace Annex
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Demolition of annex building. Replacement of classrooms from annex building demolition, Secure entry vestibule, Replace doors as needed, Replace windows as needed, Address soundproofing in cafeteria, HVAC improvements - entire facility, Replace copper water lines, Resurface asphalt, Add parking, Address car queuing and pedestrian safety.

Roof Replacement
Status: CompleteNot StartedIn DesignIn ConstructionComplete
South Cobb Early Learning Center
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

ADA Ramp/sidewalks, doors, windows, flooring, paint, restrooms

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
South Cobb High School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Doors, windows, flooring, HVAC improvements, restrooms

Stadium Improvements
Status: CompleteNot StartedIn DesignIn ConstructionComplete

Refurbish grandstands, renovate press box, ADA improvements

Tennis Court Resurfacing
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Track Resurfacing
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Sprayberry High School
New/Replacement Facilitie
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Demo 66 existing I.U.'s and provide 68 New I.U.'s include Support Spaces. New Roof on all areas.

Stadium Improvements
Status: CompleteNot StartedIn DesignIn ConstructionComplete

Replace scoreboard, refurbish grandstands, ADA improvements, Field House HVAC improvements

Tennis Court Resurfacing
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Still Elementary School
Metal PE Roof Replacement
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Replace Emergency Generator
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Window Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Painting
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Tapp Middle School
Add/Renov - Replace Annex/Ren Bldg
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Complete renovation of classroom wings to right size the classrooms and two additions to connect the main building to the science building. Phase out of the Annex building.

Auditorium Seating Replacement
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: Upcoming Design

Teasley Elementary School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Doors, windows, paint, new water coolers

Timber Ridge Elementary School
Renovations
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

HVAC, roof, and flooring replacement, restroom modernization

Replace Playscapes
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Tritt Elementary School
Addition - Replace Annex
Status: In ConstructionNot StartedIn DesignIn ConstructionComplete

District status: In Construction

Demolition of the existing Annex Building. Replacement of classrooms lost to the annex building demolition as needed, Door Replacement (as needed), Flooring Replacement (replace carpet, existing VCT to remain), Paint (interior and exterior throughout), Restroom Renovations, Asphalt Paving – Add Parking, Front Entry Security.

Varner Elementary School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Windows, paint, modify entrance for security

Asphalt Resurfacing
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Vaughan Elementary School
Renovations
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Replace HVAC in entire facility, replace roof (entire facility), new water coolers with bottle fillers, Replace all VCT with LVT, replace all carpet, replace freezer/cooler

New Digital Marquee Sign
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Replace Playscape
Status: CompleteNot StartedIn DesignIn ConstructionComplete
Walton High School
Stadium Refurbishment
Status: In DesignNot StartedIn DesignIn ConstructionComplete

District status: In Design

Refurbish grandstands, replace press box

Wheeler High School
Renovations
Status: Not StartedNot StartedIn DesignIn ConstructionComplete

District status: TBD

Doors, windows, flooring (band/orchestra/choral), paint (aux gym), HVAC improvements (aux gym and main building), restrooms, roof replacement concrete paving (widen loading dock steps), Replace sanitary sewer line, correct drainage issue in courtyard, asphalt resurfacing, replace stadium building (press box, locker rooms, restrooms)

Track Resurfacing
Status: CompleteNot StartedIn DesignIn ConstructionComplete

Last updated July 2026