Acworth Elementary School
Flooring Replacement
Addison Elementary School
Renovations
District status: In Construction
Window replacement as needed, carpet replacement, paint, restroom renovations, and modify front entrance for security.
New Digital Marquee Sign
Replace Playscape
Adult Education Center
Project information for this school is coming soon.
Allatoona High School
Site Improvements
District status: In Construction
Ramp: Add waterproof coating to pedestrian ramps. Prevent water infiltration. Paint structural steel and handrails. Canopy: Replace canopies/awnings at Gymnasium and Theater
Tennis Court Resurfacing
Learning Commons Flooring Replacement
District status: TBD
Argyle Elementary School
Flooring Replacement
Replace Bus Canopy
District status: In Design
Roof Replacement
District status: TBD
Window Replacement
District status: TBD
Aspire
Renovations
District status: Upcoming Design
Doors, restrooms
Austell Elementary School
Front Office Renovations
District status: In Design
New Digital Marquee Sign
Awtrey Middle School
Renovations
District status: TBD
Doors, replace water distribution piping, restrooms, roof replacement
Auditorium Seating Replacement
District status: In Design
Window Replacement
District status: TBD
New Digital Marquee Sign
Baker Elementary School
Roof Replacement
District status: TBD
New Digital Marquee Sign
Barber Middle School
Sidewalk Improvements
Auditorium Seating Replacement
District status: In Design
Window Replacement
District status: TBD
New Digital Marquee Sign
Bells Ferry Elementary School
Addition - 30 IU Replace/3 IU Add
District status: In Construction
Replace oldest structures with new classroom wings, new admin suite, and new learning commons. Correct ADA and code issues, enhance pedestrian and vehicular access and safety.
Belmont Hills Elementary School
Renovations
District status: TBD
Doors, fire alarm, HVAC Improvements, new water coolers, restrooms
Add Parking
District status: In Design
New Digital Marquee Sign
Replace Playscapes
Betty Gray Middle School
Renovations
District status: In Construction
Door and Window Replacement, Electrical Improvements (sub-panel upgrades and new emergency generator), refinish gym floor, new window blinds, restroom renovations, replace auditorium seating, and roof replacement.
Big Shanty Elementary School
Renovations
District status: In Construction
Door and window replacement, HVAC improvements, water piping replacement, restroom renovations, sidewalk improvements, and replace canopies.
Birney Elementary School
Renovations
District status: In Design
Window replacement, paint (interior and exterior), restroom renovations, roof replacement
Asphalt Resurfacing
District status: Upcoming Design
New Digital Marquee Sign
Replace Playscapes
Blackwell Elementary School
Renovations
HVAC replacement, roof replacement, window replacement
Brown Facility
Door Replacement
District status: TBD
HVAC Improvements
District status: TBD
Brumby Elementary School
Project information for this school is coming soon.
Bryant Elementary School
Renovations
District status: Upcoming Design
Flooring, restrooms
Roof Replacement
Bullard Elementary School
New Digital Marquee Sign
Campbell High School
Renovations
District status: In Construction
Door and window replacement as needed, new flooring, paint, and restroom renovations
Tennis Court Resurfacing
Stadium Improvements
District status: In Design
Refurbish grandstands, replace press box
Track Resurfacing
Campbell Middle School
Renovations
District status: TBD
Windows, paint, masonry (regrout brick), restrooms, concrete paving (sidewalks)
Campus Police (South Cobb Drive)
South Cobb Dr - Emergency Generator
District status: TBD
Career Academy #2 (Northern Cobb)
Northern Cobb Area
District status: In Construction
CITA #2 Cobb Innovation & Technology Academy Pathways: Advanced Computing, Skill Trade (Manufacturing, Mechatronics), Healthcare, Aviation
Chalker Elementary School
Fire Alarm Replacement
District status: In Design
New Digital Marquee Sign
Cheatham Hill Elementary School
HVAC/Elec Renovations
District status: In Design
HVAC Improvements (entire facility), replace emergency generator
HVAC Improvements
District status: In Design
HVAC Improvements and new emergency generator
City View Elementary School
Replace Playscapes
Clarkdale Elementary School
Painting
Clay Harmony Leland Elementary School
Project information for this school is coming soon.
Cobb Horizon High School
Project information for this school is coming soon.
Cobb Innovation and Technology Academy
Project information for this school is coming soon.
Cobb Online Learning Academy at CHHS
Project information for this school is coming soon.
Cobb Virtual Academy
Project information for this school is coming soon.
Compton Elementary School
Renovations
District status: In Design
Flooring, paint, renovate front office entrance, restrooms, replace canopy (Car rider), Roof replacement, replace window blinds
Replace Playscape
Cooper Middle School
Auditorium Seating Replacement
District status: In Design
Flooring Replacement (Admin/LC/Aux Gym)
District status: Upcoming Design
Daniell Middle School
Renovations
District status: In Construction
Roof replacement (annex building only), exterior door replacement, electrical subpanel upgrades, carpet replacement, restroom renovations, paint Aux Gym, and correct site water issue at Aux Gym
Auditorium Seating Replacement
District status: In Design
New Digital Marquee Sign
Davis Elementary School
Renovations
District status: TBD
Windows, flooring, restrooms
Asphalt Resurfacing
District status: In Design
Replace Playscape
Dickerson Middle School
Renovations
District status: Upcoming Design
Doors, windows, HVAC improvements, Restrooms
Dodgen Middle School
Renovations
District status: In Design
HVAC improvements, roof replacement, door replacement as needed, new fire alarm, replace epoxy flooring, modify entrance for security, concrete paving (sidewalks), correct erosion issues
Dowell Elementary School
Renovations
District status: In Construction
Correct foundation issues, window replacement as needed, flooring replacement (carpet and VCT), restroom renovations (including partition replacement)
New Digital Marquee Sign
Due West Elementary School
Renovations
District status: TBD
Paint, restrooms, replace canopy, new building lettering, roof replacement
Replace Playscapes
Durham Middle School
Renovations
District status: TBD
Repair fascia panel, new water coolers, restrooms
Fire Alarm Replacement
District status: In Design
East Cobb Middle School
Project information for this school is coming soon.
East Side Elementary School
ADA Ramp & Curb Cut
District status: In Construction
Add Canopy
District status: In Design
Stairwell Flooring Replacement
District status: TBD
New Digital Marquee Sign
Eastvalley Elementary School
Project information for this school is coming soon.
Fair Oaks Elementary School
Renovations
District status: Upcoming Design
Enclose connecting corridor, doors, HVAC, replace water piping, new water coolers, concrete sidewalks, roof replacement
New Digital Marquee Sign
Replace Playscape
Floyd Middle School
Renovations
District status: TBD
Replace exterior concrete steps, doors, electrical panels, HVAC Improvements, restrooms
Ford Elementary School
Site Improvements
Correct drainage at building; replace domestic water service line
Roof Replacement
Flooring Replacement
District status: In Construction
Frey Elementary School
Restroom Renovations
District status: In Design
Fire Alarm Replacement
District status: In Design
New Digital Marquee Sign
Garrett Middle School
Renovations
Roof replacement, restroom modernization
Auditorium Seating Replacement
District status: Upcoming Design
New Digital Marquee Sign
Garrison Mill Elementary School
Renovations
District status: Upcoming Design
Concrete curbs and gutters, restrooms, new bus canopy, roof replacement
Green Acres Elementary School
Renovations
District status: In Design
HVAC, windows, flooring, elevator, front office, water coolers
Parkin Lot Improvements
District status: In Construction
Revised circulation patterns, including a new entrance , striping, and markings to improve safety at student drop-off and pick up.
Replace Playscapes
Griffin Middle School
Renovations
District status: In Construction
Modify entrance for security, renovate FACS classroom, door and window replacement as needed, replace emergency generator, flooring replacement, and paint. Refurbish elevator.
New Digital Marquee Sign
Harrison High School
Renovations
District status: In Construction
Roof & HVAC Replacement, Restroom Renovation, FACS I.U. Renovation
Track Resurfacing
Add Parking
District status: Upcoming Design
Hawthorne
Asphalt Resurfacing/Add Parking
District status: In Design
Painting
District status: TBD
Hayes Elementary School
Renovations
District status: TBD
Electrical panel improvements, restrooms
New Digital Marquee Sign
Hendricks Elementary School
HVAC Improvements
District status: TBD
New Digital Marquee Sign
Hightower Trail Middle School
Renovations
District status: In Design
Flooring, paint, replace windows as needed
Sidewalk Improvements
District status: In Construction
Fire Alarm Replacement
District status: In Design
Painting
District status: Upcoming Design
Hillgrove High School
Site Improvements
District status: In Construction
Add waterproof coating to pedestrian ramps. Prevent water infiltration. Paint structural steel can handrails.
Tennis Court Resurfacing
Asphalt resurfacing
District status: Upcoming Design
Track Resurfacing
Hollydale Elementary School
Renovations
District status: Upcoming Design
Enclose connecting corridor, doors, windows, flooring (carpet), HVAC improvements, restrooms, Roof replacement
Human Resources (580 Glover Street)
HVAC Improvements
District status: In Design
580 Glover St - HVAC Improvements
District status: In Design
Keheley Elementary School
Renovations
District status: In Construction
Roof replacement, door and window replacement as needed, restroom renovations, paint and add canopy
New Digital Marquee Sign
Replace Playscape
Kell High School
Renovations
District status: Upcoming Design
Clean/restore fascia, replace exterior doors, window replacement, flooring, replace telescoping bleachers, masonry restoration, renovate CTAE (Culinary Arts), concrete paving (ramps), replace canopy/awnings
Tennis Court Resurfacing
Track Resurfacing
Kemp Elementary School
Add Parking
District status: Upcoming Design
Roof Replacement
District status: TBD
Kennesaw Elementary School
Renovations
District status: Upcoming Design
Flooring, modify entrance for security, restrooms
Replace Playscape
Kennesaw Mountain High School
Renovations
District status: In Design
Replace HVAC (entire facility), renovate restrooms, CTAE Construction Lab renovations, Replace telescoping bleachers in gymnasium, new fire alarm, replace doors as needed
Stadium Lighting Improvements
Auditorium Seating Replacement
Kennesaw Warehouse
Fire Sprinkler Replacement
Exterior Painting
Kincaid Elementary School
Addition - Replace Annex
District status: In Design
Demolition of the existing Annex Building. Replacement of classrooms lost to the annex building demolition as needed, Roof Replacement, Door Replacement (as needed), Replace PE Lighting, Renovate Front Entry - Security, Restroom Renovations, Asphalt Paving – Add Parking, Replace 2 Playscapes/Surfacing.
King Springs Elementary School
Project information for this school is coming soon.
LaBelle Elementary School
Renovations
District status: TBD
Windows, replace sanitary sewer line, restrooms, replace canopy
Fire Alarm Replacement
District status: In Design
New Digital Marquee Sign
Lassiter High School
Renovations
District status: Upcoming Design
Replace exterior doors, window replacement, replace lighting in main corridor, replace/remove skylights main corridor, replace acoustical panels band/orchestra/choral, replace art room casework, renovate science storage, HVAC improvements (weight room only), restroom renovations, new window blinds
Track Resurfacing
Stadium Refurbishment
District status: In Design
Refurbish grandstands, renovate press box, ADA improvements
Asphalt Resurfacing
District status: Upcoming Design
Lewis Elementary School
Renovations
District status: In Design
Replace EIFS panels, window replacement, fire alarm, flooring, paint, restroom renovations, roof replacement
New Digital Marquee Sign
Replace Playscapes
Lindley Middle School
Roof Replacement
Flooring Replacement
District status: In Construction
Auditorium Seating Replacement
District status: Upcoming Design
New Window Blinds
District status: TBD
Lost Mountain Middle School
Plumbing Improvements
Replace water distribution shut off valves
Auditorium Seating Replacement
District status: Upcoming Design
Window Replacement
District status: TBD
New Digital Marquee Sign
Lovinggood Middle School
Renovations
District status: In Design
Flooring and auditorium seating replacement
New Bottle Filler Water Coolers
Learning Commons and Aux Gym Flooring
District status: TBD
New Digital Marquee Sign
Mableton Elementary School
Mirror Replacement
New Digital Marquee Sign
Mabry Middle School
Renovations
District status: In Design
Replace doors as needed, restroom renovation (include replacement of partitions)
Maintenance (560 Glover Street)
560 Glover St - Emergency Generator
District status: TBD
McCall Primary School
New Window Blinds
District status: TBD
New Digital Marquee Sign
Replace Playscape
McCleskey Middle School
Renovations
District status: TBD
Doors, paint, restrooms, replace PE lockers
Auditorium Seating Replacement
District status: Upcoming Design
New Digital Marquee Sign
McClure Middle School
Learning Commons HVAC
Roof Replacement
District status: In Design
Flooring Replacement
District status: Upcoming Design
McEachern High School
Renovations
District status: Upcoming Design
Doors, windows (Dobbs), HVAC Improvements (Theater & Fine Arts Bldg), restrooms
Tennis Court Resurfacing
District status: In Construction
Stadium Improvements
District status: In Construction
Replace the home grandstands/concessions/restroom/team room, refurbish the visitors grandstands,
Bleacher Replacement - Main Gym
Career Tech Building Painting
District status: Upcoming Design
Asphalt Resurfacing
District status: Upcoming Design
Milford Elementary School
Renovations
District status: TBD
Windows, paint, roof replacement
Concrete Improvements
Painting
District status: Upcoming Design
Roof Replacement
District status: TBD
Window Replacement
District status: TBD
New Digital Marquee Sign
Mount Bethel Elementary School
Addition - Replace Annex
District status: Upcoming Design
Demolition of the existing Annex Building. Replacement of classrooms lost to the annex building demolition as needed, HVAC Improvements, Door Replacement (as needed), Flooring Replacement, Restroom Modifications, Front Entry Security.
Playscapes
District status: In Construction
Mountain View Elementary School
Project information for this school is coming soon.
Murdock Elementary School
Addition - Replace Annex
District status: In Construction
Demolition of the existing Annex Building. Replacement of classrooms lost to the annex building demolition as needed, Door Replacement (exterior doors), Flooring Replacement, New Fire Alarm, Paint, Restroom Renovations, Asphalt Paving – Reconfigure Traffic Flow, Replace 1 Playscape/Surfacing, Front Entry Security.
New Elementary School (Southern Cobb)
Southern Cobb Area
District status: TDB
New Elementary School - Site TBD
Nicholson Elementary School
Renovations
District status: In Design
Foundation repairs, new fire alarm system, flooring, paint, plumbing (water heaters), renovate front office, renovate restrooms, asphalt repaving, sitework grading (erosion issues), new bus canopy
Replace Playscape
Nickajack Elementary School
Renovations
District status: TBD
Replace exterior doors, paint, HVAC improvements, replace canopies, roof replacement
Replace Playscape
North Cobb High School
Renovation - Modernization
District status: TBD
Modernization of the 1950, 1960, & 1970 Era Buildings
Stadium Refurbishment
District status: In Design
Refurbish grandstands, replace press box, add restrooms
Norton Park Elementary School
Renovations
District status: Upcoming Design
Door Replacement, Flooring, Paint, HVAC Improvements, Restroom Renovations
Osborne High School
Tennis Court Resurfacing
Stadium Improvements
District status: In Design
Refurbish grandstands
Track Resurfacing
Bleacher Replacement - Aux Gym
Cafeteria Window Replacement
District status: TBD
Band/Orchestra/Choral Flooring Replacement
District status: TBD
Palmer Middle School
Roof Replacement
District status: In Construction
Add Front Canopy
District status: In Design
Auditorium Seating Replacement
District status: Upcoming Design
Pearson Middle School
Project information for this school is coming soon.
Pebblebrook High School
Renovations
District status: In Design
HVAC, doors, windows, paint, water heaters, restrooms, front entry vestibule
Tennis Court Resurfacing
Bleacher Replacement - Aux Gym
New Digital Marquee Sign
Pickett's Mill Elementary School
Carpet Replacement
Painting
District status: Upcoming Design
Add Parking
District status: Upcoming Design
Pine Mountain Middle School
New Stage Curtain
District status: TBD
Door Replacement
District status: TBD
Painting
District status: TBD
Learning Commons Flooring Replacement
District status: TBD
Pitner Elementary School
Fire Alarm Replacement
District status: In Design
Flooring Replacement
District status: Upcoming Design
New Window Blinds
District status: TBD
Replace Playscape
Pope High School
Renovations
New baseball press box, baseball field improvements, locker room renovations, flooring replacement in Media Center and Band Room, removal of corridor lockers, security vestibule, custodial door replacement, exterior door replacement
Stadium Improvements
District status: In Design
Stadium improvements (metal grandstands), renovate press box
Powder Springs Elementary School
Renovations
District status: In Design
Roof replacement, flooring, restrooms, electrical
Powers Ferry Elementary School
Renovations
Flooring, Doors, Cafeteria Windows, Toilet Room Partitions
Asphalt Resurfacing
District status: In Design
Riverside Elementary School
Restroom Renovations
District status: In Design
Rocky Mount Elementary School
Renovations
District status: TBD
Concrete paving (ramp to playground), doors, windows, paint, restrooms
Rose Garden
HVAC
HVAC replacement, electrical panel replacement
Renovations
District status: In Design
Replace doors as needed, replace windows as needed
HVAC Improvements
Asphalt Resurfacing/Add Parking
District status: Upcoming Design
Russell Elementary School
Renovations
District status: In Design
Roof replacement, foundation repairs, door replacement, window replacement, flooring, paint
Add Parking
District status: Upcoming Design
New Digital Marquee Sign
Replace Playscape
Sanders Elementary School
Replace Canopies
District status: In Design
Fire Alarm Replacement
District status: In Design
HVAC Improvements
District status: TBD
Sedalia Park Elementary School
Renovations
Flooring, Doors, Windows, Toilet Room Partitions, Sidewalk Repair
New Digital Marquee Sign
Shallowford Falls Elementary School
Renovations
Door Replacement, HVAC Replacements, Plumbing improvements (replace all copper lines), Restroom Renovations,
Add Parking
District status: Upcoming Design
New Digital Marquee Sign
Replace Playscape
Simpson Middle School
Carpet Replacement
Painting
Auditorium Seating Replacement
District status: Upcoming Design
PE Locker Replacement
District status: TBD
Smitha Middle School
Renovations
District status: Upcoming Design
Windows, flooring, paint, masonry restoration, new water coolers, modify entrance for security, roof replacement
Asphalt Resurfacing
District status: Upcoming Design
New Digital Marquee Sign
Smyrna Elementary School
Site Improvements
District status: In Construction
Asphalt paving, masonry restoration, and partial san sewer line replacement
Sope Creek Elementary School
Addition - Replace Annex
District status: In Design
Demolition of annex building. Replacement of classrooms from annex building demolition, Secure entry vestibule, Replace doors as needed, Replace windows as needed, Address soundproofing in cafeteria, HVAC improvements - entire facility, Replace copper water lines, Resurface asphalt, Add parking, Address car queuing and pedestrian safety.
Roof Replacement
South Cobb Early Learning Center
Renovations
District status: Upcoming Design
ADA Ramp/sidewalks, doors, windows, flooring, paint, restrooms
New Digital Marquee Sign
South Cobb High School
Renovations
District status: TBD
Doors, windows, flooring, HVAC improvements, restrooms
Stadium Improvements
Refurbish grandstands, renovate press box, ADA improvements
Tennis Court Resurfacing
Track Resurfacing
Sprayberry High School
New/Replacement Facilitie
District status: In Construction
Demo 66 existing I.U.'s and provide 68 New I.U.'s include Support Spaces. New Roof on all areas.
Stadium Improvements
Replace scoreboard, refurbish grandstands, ADA improvements, Field House HVAC improvements
Tennis Court Resurfacing
Still Elementary School
Metal PE Roof Replacement
Replace Emergency Generator
District status: TBD
Window Replacement
District status: TBD
Painting
District status: TBD
Tapp Middle School
Add/Renov - Replace Annex/Ren Bldg
District status: In Construction
Complete renovation of classroom wings to right size the classrooms and two additions to connect the main building to the science building. Phase out of the Annex building.
Auditorium Seating Replacement
District status: Upcoming Design
Teasley Elementary School
Renovations
District status: TBD
Doors, windows, paint, new water coolers
Timber Ridge Elementary School
Renovations
District status: In Construction
HVAC, roof, and flooring replacement, restroom modernization
Replace Playscapes
Tritt Elementary School
Addition - Replace Annex
District status: In Construction
Demolition of the existing Annex Building. Replacement of classrooms lost to the annex building demolition as needed, Door Replacement (as needed), Flooring Replacement (replace carpet, existing VCT to remain), Paint (interior and exterior throughout), Restroom Renovations, Asphalt Paving – Add Parking, Front Entry Security.
Varner Elementary School
Renovations
District status: TBD
Windows, paint, modify entrance for security
Asphalt Resurfacing
District status: In Design
New Digital Marquee Sign
Vaughan Elementary School
Renovations
District status: In Design
Replace HVAC in entire facility, replace roof (entire facility), new water coolers with bottle fillers, Replace all VCT with LVT, replace all carpet, replace freezer/cooler
New Digital Marquee Sign
Replace Playscape
Walton High School
Stadium Refurbishment
District status: In Design
Refurbish grandstands, replace press box
Wheeler High School
Renovations
District status: TBD
Doors, windows, flooring (band/orchestra/choral), paint (aux gym), HVAC improvements (aux gym and main building), restrooms, roof replacement concrete paving (widen loading dock steps), Replace sanitary sewer line, correct drainage issue in courtyard, asphalt resurfacing, replace stadium building (press box, locker rooms, restrooms)